Off-Grid Solar Installation — North West Game Farm
Back to Projects residential

Off-Grid Solar Installation — North West Game Farm

A private residence on a North West game farm had been without Eskom for more than 8 months. There was no grid to fall back on, so it had to be a proper off-grid system from day one.

We put in a 20kW SigenStor inverter with 2× 10kWh SigenStor batteries (20kWh) and 20× 665W AIKO panels on a ground mount — 13.3kWp of generation.

Because nothing else can carry the load when the sun drops, we added a 20kVA generator with smart switching on the geysers and the generator. The whole thing runs through the Home Assistant app, which decides when to heat the geysers and only starts the generator when the batteries genuinely can’t cope.

Key Specs

  • 20kW SigenStor hybrid inverter
  • 2× 10kWh SigenStor batteries (20kWh total)
  • 20× 665W AIKO panels (13.3kWp), ground-mounted
  • 20kVA backup generator
  • Smart switching for geysers and generator
  • Full system control via Home Assistant app

All solar equipment and the ground-mount system supplied by Herholdt’s Group.

Project Details

Location
North West Province
Category
residential
Completed
August 2026

Key Specs

Inverter
20kW SigenStor
Battery Storage
2× 10kWh SigenStor (20kWh)
Solar Panels
20× 665W AIKO (13.3kWp)
Backup Generator
20kVA with smart switching
System Control
Home Assistant app

Tags

solaroff-gridsigenstoraikogeneratorresidentialenergy

Need Similar Work?

Contact us to discuss your electrical project.

Get a Quote

Project Gallery

Click any photo to view it full size.

Related Projects